Andrew Haulage Projects

Andrew Haulage engage in multitude of projects in the Civil Sector.

In 2024 Andrew haulage has be completing the following contracted works

Milton to Waihola Water pipe installation

This consists of the following tasks

  • Supply and install 15.8km of new PE Pipe with the correct fittings

  • Excavation benching, shoring works, temporary fencing, temporary support to new and old

    services, dewatering, sediment and erosion management.

  • Testing of the pipeline

Bridge Repairs Contracts

  • Supply of all structural steelwork (including all bolts and timber)

  • Fabrication of all steelwork

  • Preparation and surface treatment of all structural steelwork and timber

  • Storage of structural steelwork and timber

  • Transport to and offloading on site of all structural steelwork and timber

  • Erection of all structural steelwork and timber

  • Making all steel to steel, steel to concrete and steel to timber connections

  • Repair of existing steel beams.

Milton Main Street Utility Services

Supply and installation of stormwater, wastewater and water infrastructure works for the Milton township. The works also includes the civil works to install electrical ducts across road intersections and coordinate the installation of cables and lighting poles as part of the Union Street Streetscape Project.

Balclutha Town Pump Station Relocation

Excavate for and install the new 1,850mm dia. X 4,000mm deep moulded fibreglass pump chamber complete with aluminium lids, pipework and penetrations as detailed.

  • Supply and install reinforced concrete foundation slabs including anti-flotation devices as detailed.

  • Excavate for, supply and install material, pipework and fittings as detailed for the construction of new manhole next to the existing incoming main

  • Excavate for, supply and install pipework and fittings as detailed for the connection to the existing rising main including thrust block

  • Excavate for, supply and install pipework and fittings as detailed for the connection to the existing emergency overflow main

  • Supply and install new 1050mm dia. manhole flowmeter chamber.

  • Backfilling and supply and install reinforced concrete ballast for underground chambers.

  • Install the two new pumps complete with, flexible pipework, fixings and stainless

  • steel lifting chains inside the pump chamber.

  • Excavate for, supply and install a 32mm internal diameter (ID) water connection, backflow preventer to the new pump station.

  • Supply and install concrete slabs as required around pump station lids, including concrete plinths for the electrical control cabinet, and McBerns odour filter.

  • Dewatering of all excavations, to the extent required, including well pointing.

  • Backfilling and site reinstatement as required. 

FORESTRY ROADING - Clutha Southland

Since 1992 we have been consistantly contracted to carry out the Southern Area roading requirements for Rayonier NZ Ltd and continue to do so through their managment of Matariki Forests. This has involved the building of many kilometres of new roads, the construction of skid sites and hauler pads and the upgrading and maintenance of arterial roads throughout Rayonier's and Matariki Forest's forests.